Removal Of Horizontal Vane - Daikin FCQ35B7V1 Service Manual

Hide thumbs Also See for FCQ35B7V1:
Table of Contents

Advertisement

ESIE05-04

1.12.4 Removal of Horizontal Vane

Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
1
Removing the decoration
panel
Refer to the "Removal
of Decoration Panel"
2
Remove the padding at
four corners of frame
fixed with three screws
each. At that time, peel
the end of black sealing
material of discharge port
in part.
Note: When restore the
sealing material of
discharge port, be careful
that no clearance exists
between padding and
sealing material as
original installation.
(Otherwise, due dripping
may occur due to leakage
of cool air.)
Part 5 – Disassembly and Maintenance
Procedure
Padding
Sealing material
of discharge port
Anti-sweat material
Disassembly and Maintenance
Peel not the anti-sweat
material but only sealing
material of discharge port.
(S2642)
Sealing material
of discharge port
(S2644)
1
Points
3
Anti-sweat material
5
5
(S2643)
5–49

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents