Daikin FCQ35B7V1 Service Manual page 324

Hide thumbs Also See for FCQ35B7V1:
Table of Contents

Advertisement

Disassembly and Maintenance
Step
1
3
Re-connect the outdoor
unit connection wire, the
earth wire and wire of
remote controller as they
were, and fix them
securely with tie wrap.
(Only when install the
switch box)
3
3 Installing the decoration
panel
1
Put the two holes on the
decoration panel to the
5 5
panel mounting screws
and slide the panel, turn
the stoppers to prevent
the panel from falling
down, then install the
remainder two screws.
5–74
Procedure
Power
transformer
PC
board
Outdoor unit connection
wire and earth wire
Tie wrap
Be sure to fix the lead wire to
be connected to the connector
X10A for low-tension cable of
transformer to the switch box
with tie wrap
(The tie wrap is used for
preventing the wire from
contact with a hot part on the
PC board.)
Terminal of outdoor unit
connection wire
(S2691)
When installing the decoration
panel, be careful not to catch
the lead wire.
(S2692)
Part 5 – Disassembly and Maintenance
ESIE05-04
Points
.
(S2693)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents