Daikin FCQ35B7V1 Service Manual page 309

Hide thumbs Also See for FCQ35B7V1:
Table of Contents

Advertisement

ESIE05-04
1.12.9 Removal of Drain Pump
Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
1 Removing the drain pump
1
Remove two screws
fixing float switch ass'y.
(Screw and )
2
Remove the float switch
ass'y.
Part 5 – Disassembly and Maintenance
Procedure
Screw
Screw
Disassembly and Maintenance
Screw
(S2660)
Remove the float switch before
removing drain pump in order
to prevent the float switch from
damage.
(S2661)
1
Points
3
5
5
5–59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents