Daikin FCQ35B7V1 Service Manual page 304

Hide thumbs Also See for FCQ35B7V1:
Table of Contents

Advertisement

Disassembly and Maintenance
Step
1
3
Remove five pieces of
lead wires from PCB on
the switch box and lead
wire connected to the
capacitor for fan motor.
(Refer to the list shown in
the right.)
4
Cut tie wraps fixing lead
wires of float switch,
thermistor for heating and
3
liquid pipe thermistor.
5
Remove two fixing
screws located at both
ends of switch box and
one screw inside the box.
5 5
6
Remove the switch box.
5–54
Procedure
Five pieces lead wires shown below (connect to the PCB) and
lead wire connected to the capacitor for fan motor.
X15A······Lead wire of float switch
X17A······Lead wire of thermistor for heating
X18A······Lead wire of liquid pipe thermistor
X20A······Lead wire of fan motor
X25A······Lead wire of drain pump
ESIE05-04
Points
(S2763)
Part 5 – Disassembly and Maintenance

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents