Daikin FCQ35B7V1 Service Manual page 353

Hide thumbs Also See for FCQ35B7V1:
Table of Contents

Advertisement

ESIE05-04
Step
3
Disconnect wires and
connectors from PCB.
4
Arrange wire harness to
avoid interference with
next process.
5
To dismount drain pan
blocking plate, remove
each two mounting
screws located at four
corners.
Part 5 – Disassembly and Maintenance
Procedure
Disassembly and Maintenance
Points
Caution:
This work should be done by two
personnel.
If drain water remain in the pan, it
may drop and stain on the floor.
Make sure to check if no drain
water remain in the pan, or cover
the floor with vinyl sheet before
disassembling work.
1
3
5
5
5–103

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents