Daikin FCQ35B7V1 Service Manual page 356

Hide thumbs Also See for FCQ35B7V1:
Table of Contents

Advertisement

Disassembly and Maintenance
Step
1
4
Removing float switch
a. Loosen three
mounting screws to
remove drain pump
mounting base.
b. Remove two screws
located at opposite side
of drain pump mounting
base to dismount float
switch.
3
5 5
5–106
Procedure
ESIE05-04
Points
Part 5 – Disassembly and Maintenance

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents