Inserting The Packing Cord; Knocking The Central Section Into Place - Buderus Logano G215 WS Installation And Maintenance Instructions Manual

Oil and gas-fired special
Hide thumbs Also See for Logano G215 WS:
Table of Contents

Advertisement

7.1.4 Inserting the packing cord

Unroll the required length of packing cord from the
roll supplied.
SYSTEM DAMAGE
through leaking boiler sections.
Never stretch the packing cord during
CAUTION!
application to ensure that the faces
between the boiler sections are sealed
correctly.
Carefully insert the packing cord into
the boiler section packing grooves.
Peel the backing paper off the packing cord, as you
insert the cord into the packing groove.
Insert the flexible packing cord into the packing
groove, starting in the upper boiler hub area, and
lightly press in.
At the butt joints, overlap the packing cord by 2 cm
and press firmly together.

7.1.5 Knocking the central section into place

Turn the centre section around and locate with the
upper and lower boiler hubs on the nipples of the rear
section.
Drive the centre section onto the rear section using a
wooden or a rubber mallet.
Logano G215 WS - We reserve the right to make any changes due to technical modifications.
Assembling the boiler block
Fig. 9
Inserting the packing cord
Fig. 10 Knocking the central section into place
1 Wooden or rubber mallet
2 Rear section
7
1
2
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents