Assembling The Boiler Block - Buderus Logano G215 WS Installation And Maintenance Instructions Manual

Oil and gas-fired special
Hide thumbs Also See for Logano G215 WS:
Table of Contents

Advertisement

7

Assembling the boiler block

7
Assembling the boiler block
The on-site installation is carried out using individual
sections if, because of physical limitations, a boiler block
cannot be assembled as a complete unit.
For the further installation of pre-assembled boiler
sections, see (
Section 7.3, page 27)
RISK OF INJURY
through inadequate securing during
transport.
CAUTION!
Use only suitable means for
transportation, e.g. a sack trolley with
strap, a stair or step trolley.
Secure the load against falling.
16
Logano G215 WS - We reserve the right to make any changes due to technical modifications.
5
4
3
2
1
Fig. 4
Boiler block in the assembled state
1 Foundation/installation location
2 Drain
3 Rear section
4 flue outlet
5 connecting block
6 Central sections
7 Anchor rods
8 Front section
9 Burner door
6
7
8
9
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents