7.1
Assembly when delivered in separate sections
Assemble all boiler sections in accordance with the
following instructions and diagrams.
7.1.1 Preparation of boiler sections
Locate the rear section on two timber supports.
Clean the boiler hubs with emery paper and a rag.
Remove any burrs which might have been created
with a file.
Clean the packing spring or packing groove where
required using a wire brush and rag.
RISK TO HEALTH and
RISK OF BURNING
through released vapours and easily
CAUTION!
flammable cleaning agents.
During the use of red lead putty,
adhesives and solvents ensure
adequate ventilation inside the boiler
room.
When using solvents, avoid naked
flames, incandescence and sparks.
Please observe the manufacturer's
handling and safety instructions.
Clean the hub sealing faces with a rag soaked in
white spirit.
Evenly coat the boiler hub sealing faces with red lead
putty.
Coat the packing spring or packing groove with
adhesive (adhesive base).
Logano G215 WS - We reserve the right to make any changes due to technical modifications.
Assembling the boiler block
2
1
Fig. 5
Remove burr
1 Boiler hubs
2 Rear section
3 Timber supports
4 Sealing spring
1
Fig. 6
Coating the boiler hubs with red lead putty
1 Boiler hub sealing face
2 Sealing spring
7
1
3
4
1
2
17