Assembling the boiler block
Installing the upper tie-bar
Secure the upper cross bar using the nuts provided
on the threaded anchor rods.
Installing the lower tie-bar
Secure the lower tie-bar to the front section using
hexagon bolts.
Installing lagging
Place the lagging over the boiler block.
Push the lagging under the boiler block, in the
direction of the arrow.
Position the lagging tabs in front of the upper tie-bar
and draw together with a spring clip.