Mounting Procedure - Panasonic VF100 Instruction Manual

Table of Contents

Advertisement

Inverter side
Installed on the plate (panel)
£¼Forward side£¾

[Mounting Procedure]

1. Manufacture the mounting plate according to dimensions of panel cut-out. The suitable
thickness is 1.0mm~3.5mm.
2. Mount the operation panel on the forward side of plate (panel), and mount the attached
mounting screws on the reverse side. (Tightening torque: 0.6N•Em)
3. Mount LAN cable after the operation panel is installed.
18
Connector (RJ45)
LAN cable
Plate (panel)
£¼Reverse side£¾
Mounting screws(M3)
A
Mounting screws(M3)
Operation panel side
2£-¦Õ3.5(Mounting holes)
61
panel cut-out
24
Dimensions of panel cut-out (A view)
Connector (RJ45)
LAN cable
Unit : mm
(18.5)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vf100

Table of Contents