Cable And Harness Routing; Implement Monitor Installation - New Holland T6010 Operator's Manual

New holland t6010; t6020; t6030; t6050; t6070 tractors
Hide thumbs Also See for T6010:
Table of Contents

Advertisement

SECTION 2 - - CONTROLS, INSTRUMENTS AND OPERATION

Cable and Harness Routing

So the operating cable from the monitor may be
conveniently routed to the equipment, a small
aperture is provided in the filler plate each side of the
lower rear window frame. By making a small incision
in the rubber at (1), cables or wiring can be easily
routed through the filler plate.

Implement Monitor Installation

To facilitate installation of an implement monitor, two
mounting points are provided:
To meet SAE standards, captive bolts (1), protected
by plastic covers, are provided on the the right-hand
cab 'C' pillar.
It is recommended that a bracket be screwed to the
'C' pillar to mount the monitor. A suitable bracket is
available from your authorised dealer.
An alternative monitor mounting position (1) is
provided on the inner face of the right-hand 'A' pillar.
2--24
41
42
43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

T6030T6070T6020T6050

Table of Contents