BMW k 1200 rs Repair Manual page 218

Hide thumbs Also See for k 1200 rs:
Table of Contents

Advertisement

5
Installing gearbox
23 00
Insert gearbox into intermediate flange and push
on to reamed sleeves.
L
Note:
One screw (6) also secures the heat shield.
Tighten the six screws (6) holding the gearbox to
the intermediate flange.
Install starter motor (7) with wiring.
Install heat shield with fasteners (4,5).
Insert clutch pushrod (3) into gearbox, noting
correct installed position.
Secure cable for side stand switch to gearbox
with cable tie (arrow).
23.10
8
7
6
4
1
3
e
Important:
The alignment of the left-hand rubber mounts rela-
tive to the frame is preset at the factory; do not
slacken the securing screws.
The rubber mounts do not have to be re-aligned un-
less the left-hand rubber mount has been replaced.
Slightly lower the frame.
Tighten screw (2) holding gearbox to frame.
L
Note:
When lowering the frame, make sure that clearance
is adequate on the right between frame and gear-
box: do not scratch the surfaces.
Tighten screw (2) holding gearbox to frame.
Screw the left/right engine mountings to the
cross-member.
L
Note:
Reinstall the main (centre) stand, if it was removed
beforehand (
46.20).
a
Lower the frame (
46.31).
a
2
KR230010

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents