Disassembly - Suzuki RM-Z450 Owner's Service Manual

Hide thumbs Also See for RM-Z450:
Table of Contents

Advertisement

12-6
FUEL SYSTEM
• Remove the throttle pulley cover 6.
• Loosen the lock-nuts 7.
• Remove the throttle cables from the pulley.

DISASSEMBLY

• Remove the hot starter valve 1 and spring from the hot
starter cable.
• Remove the drain hose, fuel hose and air vent hoses.
NOTE:
Do not remove the throttle position sensor 2 unless it is neces-
sary to replace it.
• Remove the starter valve 3.
• Remove the top cap 4 and gasket.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents