Download Print this page

Preventive Maintenance (Pm); General Descriptions For Pm Procedure - Toshiba e-studio166 Service Handbook

Multifunctional digital systems
Hide thumbs Also See for e-studio166:

Advertisement

4.

PREVENTIVE MAINTENANCE (PM)

4.1

General Descriptions for PM Procedure

Perform the preventive maintenance in the following timing.
e-STUDIO163/166: every 72,000 sheets
e-STUDIO203/206: every 90,000 sheets
(1)
Preparation
Ask the user about the current conditions of the equipment and note them down.
Before starting maintenance, make some sample copies and store them.
Turn OFF the power and make sure to unplug the equipment.
(2)
Perform a preventive maintenance using the following checklist and illustrations. Refer to the
Service Manual if necessary.
(3)
Plug in the equipment after the maintenance has been finished. Then turn ON the power and
make some copies to confirm that the equipment is working properly.
(4)
After preventive maintenance, set the value of 08-252 (Current value of PM counter Display) to
"0".
*This turns off the "CALL SERVICE" symbol.
© 2005 - 2009 TOSHIBA TEC CORPORATION All rights reserved
4 - 1
07/02
e-STUDIO163/166/203/206
PREVENTIVE MAINTENANCE (PM)
4

Hide quick links:

Advertisement

loading

This manual is also suitable for:

E-studio163E-studio203E-studio206