Download Print this page

Toshiba e-studio166 Service Handbook page 127

Multifunctional digital systems
Hide thumbs Also See for e-studio166:

Advertisement

(6)
Insert the gauge with the thickness "0.45" of
the doctor sleeve jig into the gap between
the developer sleeve and doctor blade after
lifting up the toner scattering prevention
sheet.
Adjust the screws with the doctor blade to
push the doctor sleeve jig lightly.
(7)
Insert the gauge "0.40" of the doctor sleeve
jig into the gap between the developer
sleeve and doctor blade. Confirm that the jig
moves smoothly to the front and rear side,
and the gauge "0.50" cannot be inserted into
the gap.
(8)
Confirm that the side seals are attached on
the toner scattering prevention sheet.
© 2005 - 2009 TOSHIBA TEC CORPORATION All rights reserved
Doctor sleeve jig
Toner scattering
prevention sheet
Fig. 3-33
Doctor sleeve jig
Developer
sleeve
Fig. 3-34
Side seal
Fig. 3-35
3 - 43
Screw
Toner scattering
prevention sheet
e-STUDIO163/166/203/206
ADJUSTMENT
3

Hide quick links:

Advertisement

loading

This manual is also suitable for:

E-studio163E-studio203E-studio206