Daewoo MUSSO Service Manual page 74

Hide thumbs Also See for MUSSO:
Table of Contents

Advertisement

1A3-14 GENERAL ENGINE INFORMATION
Leakage Test
1. Run the engine to be the coolant temperature 80°C.
2. Remove the fuel injection nozzle.
3. Open the coolant subtank cap.
4. Check the coolant level and replenish if necessary.
5. Open the oil filler cap.
6. Remove the air cleaner cover and element.
7. Position the piston at TDC.
8. Install the connector (1) and connection piece (2).
9. Calibrate the tester and connect the connection hose
(3)
10. Pressurize with compressed air and compare the
pressure changes with permissible pressure leakage.
11. If permissible pressure leakage is out of standard, check
followings :
- Intake and exhaust lines.
- Sounds in oil filler area.
- Air bubbles in radiator coolant.
12. Do pressure leakage test for the remaining cylinders
according to the firing order.
OM 662LA Engine : 1-2-4-5-3
OM 661LA Engine : 1-3-4-2
13. Remove the tester.
14. Close the coolant pressure cap and oil filler cap.
15. Install the air cleaner element and cover.
16. Install the fuel injection nozzle.

Advertisement

Table of Contents
loading

Table of Contents