Basic Operating Procedure; Section 2 - Omron CX-PROCESS MONITOR PLUS V2 - 01-2007 Operation Manual

Table of Contents

Advertisement

Basic Operating Procedure

Item
Graphic
Data
Data input
screen
objects
range checks
objects
Text string
positions
Switch
Text string
objects
specification
Data and
Background
text box
color transpar-
objects
ency
Data and
Operation log
switch
objects
Number of simultaneous
Graphic Builder screens for
editing
Logs
CSV file output (operation
logs, alarm logs, operation
logs, and system monitor
logs)
Opera-
Number of operation guide
tion
messages registered
guide
mes-
sages
Starting external applications and
starting/resetting from external appli-
cations
Confirmation message when exiting
the CX-Process Monitor Plus
Note
1-2
Basic Operating Procedure
1,2,3...
Previous (version 1.0)
No
Left justified and centered vertically.
Only ON, OFF, START, and STOP can
be specified.
No
No
One screen only
Single lines are output without separat-
ing individual items.
100 max.
A portion of the CX-Process Monitor
Plus display remains.
Exits with no message.
The CX-Process Monitor Plus does not support Loop Control Units earlier
than version 2.0.
This section explains the procedure up to monitoring using CX-Process Moni-
tor Plus.
1. Install CX-Process Monitor Plus. (Refer to Section 2 Setup.)
• Install CX-Process Monitor Plus.
2. Make Settings and Transfer Using CX-Process Tool. (Refer to the CX-Pro-
cess Tool Operation Manual (W372).)
a. Set the network address, node address, and unit address (Settings –
Network).
b. Register and connect the function blocks that exchange data with the
CX-Process Monitor Plus.
c. Set the CSV tags and the tags for Monitor Plus.
Section 1-2
New (version 2.0)
Yes
(Upper and lower limits can be checked
for inputs.)
The following are possible: Left justified,
horizontally centered, right justified, top
aligned, vertically centered, and bottom
aligned.
Any text string can be specified.
Yes
Yes
Multiple Graphic Builder screens can be
displayed simultaneously for editing, and
objects can be copied between screens.
Each item can be separated in the out-
put (making later analysis easier).
1,000 max.
The CX-Process Monitor Plus Window
is completely cleared and the external
application is started. (The CX-Process
Monitor Plus runs in the background and
collects data.)
The CX-Process Monitor Plus can be
reset by starting the execution file from
an external application.
A dialog box is displayed to confirm
whether the Monitor Process is to be
ended during execution.
23

Advertisement

Table of Contents
loading

Table of Contents