Segment Program 2 Edit Screen Display Examples And Operations - Omron CX-PROCESS MONITOR PLUS V2 - 01-2007 Operation Manual

Table of Contents

Advertisement

Segment Program 2 Screens
4-11-3 Segment Program 2 Edit Screen Display Examples and
Operations
Editing Step Data
1,2,3...
Segment data for the relevant Segment Program 2 Block can be set while
observing actual segment status in realtime, and the settings can be trans-
ferred to the Loop Controller.
Click to display the dialog box for
editing data for each step.
Time scroll
Sets the time from
Shifts one half screen
which data will be
to the past.
displayed.
Note
The following dialog box will be displayed if step data registered in the Loop
Controller is updated when the Segment Program 2 Edit Screen is displayed.
Click the Yes Button to update the step data.
1. Click the step area at the top of the Segment Program 2 Edit Screen.
Shows segment data collection status.
Shows segment data collection status.
Click to display the Collection Status Monitor Dialog Box.
Click to display the Collection Status Monitor Dialog Box.
Used to zoom the
Sets the maximum width
scale displayed.
for the time axis dis-
played on the screen.
Click the step to be
edited.
Click to set the initial
values.
Section 4-11
Click to move to the Segment
Program 2 Monitor Screen.
Used to add bias to
Time scroll
the display.
Shifts one half screen
to the future.
Reads Segment
Program 2 step data
from the Controller.
Writes to the Controller
the step data set on
the Segment Program
2 Edit Screen
121

Advertisement

Table of Contents
loading

Table of Contents