Paradyne HotWire 7974 User Manual page 119

Standalone termination unit
Table of Contents

Advertisement

7970-A2-GB20-00
Table A-5. System Options
DSL Mode
Possible Settings: LTU, NTU
Default Setting: NTU
Controls whether the unit is configured as a control unit or tributary unit.
LTU – The unit is configured as a control unit (Line Termination Unit).
NTU – The unit is configured as a tributary unit (Network Termination Unit). This unit will
request its IP address from the LTU during establishment of the PPP link.
NOTE:
Changing this option will reset the termination unit.
Test Timeout
Possible Settings: Enable, Disable
Default Setting: Enable
Allows tests to end automatically. The feature should be enabled when the unit is
remotely managed so that control can be regained after a test is accidentally executed.
Enable – Loopback and pattern tests end when test duration is reached.
Disable – Tests run until manually terminated from the Network Tests screen or
remotely (network initiated tests). Refer to
Test Duration (min)
Possible Settings: 1–120
Default Setting: 10
Number of minutes for a test to be active before automatically ending.
H
Test Duration (min) appears when Test Timeout is enabled.
1 to 120 – Amount of time in minutes for a test runs before terminating.
Telco Initiated Loopback (Models 7974, 7984)
Possible Settings: Enable, Disable
Default Setting: Enable
Determines if the unit will respond to loopback commands on the DSX-1 interface. See
Telco-Initiated Tests
in Chapter 6, Testing .
Enable – The unit will respond to loopback commands.
Disable – The unit will not respond to loopback commands.
Remote Telco Line Loopback (Models 7974, 7984)
Possible Settings: Enable, Disable
Default Setting: Disable
Determines if the unit will perform a Telco-initiated loopback on just the local unit or if
the loopback will be performed on the remote DSL unit. See
Chapter 6, Testing .
Enable – The loopback is performed on the remote unit.
Disable – The loopback is restricted to the local unit.
August 1999
Configuration Option Tables
Running Network Tests
in Chapter 6, Testing .
Telco-Initiated Tests
in
A-13

Advertisement

Table of Contents
loading

Table of Contents