2-2 Installing the cabinet

Prerequisites for installation

The operating company is responsible for the choice of site and compliance
with local regulations such as the applicable electrical codes, right-of-way
easements, and noise requirements.
The installation procedures in this chapter assume the following:
AccessNode 323-3001-210 Issue 1.0
All hardware and materials listed below are available and have been
checked for completeness and readiness for installation.
— one pad sealant kit (shipped loose inside the cabinet)
— one 2.5-inch (63.5 mm) trade size permanent virtual circuit (PVC)
conduit straight coupling (supplied as part of the power pedestal ac
option)
— leveling shims
— caulking compound
The correct cabinet pad has been poured, cured and prepared at the site as
described in Chapter 1, "Installing the pad".
All the required drawings, local installation instructions, job
specifications, and other documentation are available and ready for use.
The precast pad descriptions and the reference drawings for each pad are
described in Chapter 1, "Installing the pad" in these tables:
— Table 2-2, "Termination compartment conduit openings" on page 2-4
— Table 2-3, "AC load box conduit openings" on page 2-4