Procedure; Preparing The Pad - Nortel SONET AccessNode 800A Series Manual

Outside plant cabinet installation
Table of Contents

Advertisement

2-10 Installing the cabinet

Procedure 2-2

Preparing the pad

Use this procedure to prepare the pad for cabinet installation.
Precautions
The following safety precautions should be observed at all times during the
cabinet installation procedures:
Tools and materials required
AccessNode 323-3001-210 Issue 1.0
CAUTION 1
Potential equipment damage and personal injury
No equipment should be installed until the cabinet is firmly
secured to its mounting pad, as described in this procedure.
CAUTION 2
Potential equipment damage and personal injury
When the cabinet is not secured on the mounting pad, its
stability is greatly reduced. Do not open the front or rear
doors unless the cabinet is firmly secured to the shipping
pallet or the mounting pad.
CAUTION 3
Potential equipment damage
Use special care to prevent damage when handling the
sealant kit material.
one hacksaw or similar cutting tool to cut the cable conduit
one 2.5-inch (63.5 mm) trade size permanent virtual circuit (PVC) conduit
straight coupling (supplied with the ac power pedestal option)
one sealant kit supplied with the cabinet
—continued—

Advertisement

Table of Contents
loading

Table of Contents