Pad Installation; Anchor Plate Kits; Cable Entry - Nortel SONET AccessNode 800A Series Manual

Outside plant cabinet installation
Table of Contents

Advertisement

1-4 Installing the pad

Pad installation

Typically, the cabinet is mounted on a poured concrete pad with buried power
and telephone cables passing up through the pad into the bottom of the cabinet
via cabling conduit.

Anchor plate kits

To facilitate placement, optional anchor plate kits are available as shown in
Table 1-3. Each kit consists of an 11-gauge galvanized anchoring template
assembly with anchor bolts and temporary support angles.
Table 1-3
Anchor plate kits and drawings
For this anchor plate kit
assembly
Load box, wide
Load box, narrow
AC pedestal, wide
AC pedestal, narrow

Cable entry

The S800A cabinet is constructed with cable conduit entry ports located at the
bottom of the end compartments of the cabinet.
Termination compartment
The termination compartment has four 4.50-inch inside diameter (ID)
openings for 4.00-inch trade size conduit, and one 2.00-inch ID opening for
1.50-inch trade size conduit. See Table 1-4 on page 1-5.
AccessNode 323-3001-210 Issue 1.0
Note: All trade sizes listed are based on Schedule 40 PVC.
Refer to
Figure 1-10 on page 1-18
Figure 1-11 on page 1-19
Figure 1-12 on page 1-20
Figure 1-13 on page 1-21
Drawing number
EV7A52FA
EV7A52CA
EV7A52GA
EV7A52DA