Nortel SONET AccessNode 800A Series Manual page 235

Outside plant cabinet installation
Table of Contents

Advertisement

Procedure 9-1 (continued)
Installing 12 V batteries in a cabinet
Step
12
13
Table 9-6
Battery string circuit breaker assignments for 12 V batteries
If quantity of battery strings
you have installed is
3
4
5
6
7
8
9
10
11
12
13
14
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Action
Connect the battery string cable assemblies to the corresponding connector
on the battery interface connector field (see Figure 9-4 on page 9-11).
Note 1: The battery string numbers are labeled on each battery harness to
correspond to the connections on the BBP adapter.
Note 2: If the number of battery strings (minimum of three) to be installed is
3, 4 or 5, then each battery string must be connected to an odd numbered
battery interface connector field position (1, 3, 5, 7 and 9). The even
numbered connector positions (2, 4, 6, 8 and 10) must be insulated
(completely covered) with heat-shrinkable tubing.
Turn circuit breakers BATT 1-2 and BATT 13-14 to the On position on the BBP.
See Table 9-6.
—end—
Installing and connecting the batteries 9-13
Then connect the battery strings
(in sequence)
to battery interface connector positions
1, 3, 5
1, 3, 5, 7
1, 3, 5, 7, 9
1, 3, 5, 7, 9, 11
1, 3, 5, 7, 9, 11, 13
1, 2, 3, 5, 7, 9, 11, 13
1, 2, 3, 4, 5, 7, 9, 11, 13
1–7, 9, 11, 13
1–9, 11, 13
1–11, 13
1–13
1–14

Advertisement

Table of Contents
loading

Table of Contents