Ac Load Box Option - Nortel SONET AccessNode 800A Series Manual

Outside plant cabinet installation
Table of Contents

Advertisement

2-4 Installing the cabinet
Table 2-2 shows the conduit openings in the termination compartment.
Table 2-2
Termination compartment conduit openings
Opening size
4.50 in.
(11.43 cm)
4.50 in.
(11.43 cm)
4.50 in.
(11.43 cm)
4.50 in.
(11.43 cm)
2.00 in.
(5.08 cm)

AC load box option

The ac load box option has two 3 in. ID openings for 2 in. trade size conduit
and a 1 in. ID opening for 1 in. trade size conduit for grounding.
The ac power enters the S800A cabinet via conduit holes located on the bottom
left side of the ac power compartment.
Table 2-3 shows the conduit openings in the ac load box.
Table 2-3
AC load box conduit openings
Opening size
3.0 in.
(7.62 cm)
3.0 in.
(7.62 cm)
1.5 in.
(3.81 cm)
AccessNode 323-3001-210 Issue 1.0
Conduit trade size Function
4.00 in.in.
VF - pairs 1–600 cable entrance
(10.16 cm)
4.00 in.
VF - pairs 601–1200 cable entrance
(10.16 cm)
4.00 in.
VF - miscellaneous cable entrance
(10.16 cm)
4.00 in.
VF - HF or fiber cable entrance
(10.16 cm)
1.50 in.
Earth ground rod connection entrance
(3.81 cm)
Conduit trade size Function
2.0 in.
Miscellaneous - dc feed, when required
(5.08 cm)
2.0 in.
AC entrance - commercial ac feed
(5.08 cm)
1.0 in.
Earth ground rod connection entrance
(2.54 cm)

Advertisement

Table of Contents
loading