Prerequisites for installation

The choice of site and compliance with local regulations (such as the
applicable electrical codes, right-of-way easements, and noise requirements)
are the responsibility of the operating company.
AccessNode 323-3001-210 Issue 1.0
The cabinet has been mounted on the selected concrete pad as defined in
Chapter 2, "Installing the cabinet".
All hardware and materials are available, and have been checked for
completeness and readiness for the installation.
All the required drawings, local installation instructions, job
specifications, and other documentation are available and ready for use.