Nortel SONET AccessNode 800A Series Manual page 227

Outside plant cabinet installation
Table of Contents

Advertisement

Procedure 9-1 (continued)
Installing 12 V batteries in a cabinet
Action
Step
1
Table 9-3
Battery string circuit breaker assignments
If quantity of battery strings
(minimum of three) you are
installing is
3
4
5
6
7
8
9
10
11
12
13
14
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Action
Turn the battery breaker panel (BBP) circuit breakers to the Off position for
the battery strings to be installed (see Table 9-3).
—continued—
Installing and connecting the batteries 9-5
Then turn these BBP circuit breakers to the
Off position
BATT 1-2, BATT 3-4, BATT 5-6
BATT 1-2, BATT 3-4, BATT 5-6, BATT 7-8
BATT 1-2, BATT 3-4, BATT 5-6, BATT 7-8,
BATT 9-10
BATT 1-2, BATT 3-4, BATT 5-6, BATT 7-8,
BATT 9-10, BATT 11-12
BATT 1-2, BATT 3-4, BATT 5-6, BATT 7-8,
BATT 9-10, BATT 11-12, BATT 13-14
BATT 1-2, BATT 3-4, BATT 5-6, BATT 7-8
BATT 1-2, BATT 3-4, BATT 5-6, BATT 7-8,
BATT 9-10
BATT 1-2, BATT 3-4, BATT 5-6, BATT 7-8,
BATT 9-10
BATT 1-2, BATT 3-4, BATT 5-6, BATT 7-8,
BATT 9-10, BATT 11-12
BATT 1-2, BATT 3-4, BATT 5-6, BATT 7-8,
BATT 9-10, BATT 11-12
BATT 1-2, BATT 3-4, BATT 5-6, BATT 7-8,
BATT 9-10, BATT 11-12, BATT 13-14
BATT 1-2, BATT 3-4, BATT 5-6, BATT 7-8,
BATT 9-10, BATT 11-12, BATT 13-14

Advertisement

Table of Contents
loading

Table of Contents