Outside plant cabinet installation
Table of Contents

Advertisement

3-18 Connecting commercial power
Procedure 3-5 (continued)
Wiring the ac power pedestal
Action
Step
1
2
3
4
5
6
7
8
9
10
Table 3-6
AC voltage verification
AC input
230 Vac
115 Vac
115 Vac
11
AccessNode 323-3001-210 Issue 1.0
Action
Route the power cabling from the top-mounted meter socket through the right
hub and into the cable wire way.
Route the line ac lead through the knockout bushing into the transfer knife
switch and terminate at the line lugs.
Route the neutral lead from the top-mounted meter socket through the right
hub and into the cable wire way.
Continue through the left side knockout bushing into the distribution load
center and terminate at the neutral bus bar.
Route the ground lead from the meter socket panel through the right hub into
the cable wire way.
Continue through the left side knockout bushing into the distribution load
center and terminate at ground bus bar.
Note: Consult NEC and local codes for appropriate cable size.
Pull the outside line power cable through the left hub into the meter socket
panel and terminate per NEC and local codes.
Check that the neutral bonding screw in the cabinet ac load box panel is
tightly secured to the neutral ground bar.
Turn the commercial ac power feed to the ON position.
Use a voltmeter to verify power measurements listed in Table 3-6.
For branch circuits
L1 bar to L2 bar
L1 bar to N bar
L2 bar to N bar
Reinstall all cover panels and secure tightly.
—end—