Prerequisites For Installation; Precautions - Nortel SONET AccessNode 800A Series Manual

Outside plant cabinet installation
Table of Contents

Advertisement

6-2 Routing and terminating the VF cables

Prerequisites for installation

The prerequisites for routing and terminating the VF cabling include:

Precautions

The following safety precautions should be observed at all times during the
OSP cable bonding and grounding procedures:
AccessNode 323-3001-210 Issue 1.0
The cabinet has been mounted on the selected concrete pad as defined in
Chapters 1 through 5.
All hardware and materials are available and have been checked for
completeness and readiness for the installation.
— customer supplied outside plant cable hole and conduit plugging
compound
All the required drawings, local installation instructions, job
specifications, and other documentation are available and ready for use.
Route the binder groups to connectors 601–1200 first (this group is on the
left side of the cross-connect frame).
No equipment should be installed until the cabinet is firmly secured to its
mounting pad, as described in this procedure.
Do not open the front or rear doors unless the cabinet is firmly secured to
the mounting pad.
Observe all NEC and local codes for electrical wiring.
CAUTION
Local wiring codes
The procedures in this chapter are recommended guidelines;
be sure to follow all local codes for wiring procedures.