Wall Mount Plate Mounting - Planet IGS-10020HPT-U User Manual

Industrial 8-port 10/100/1000t 802.3at poe + 2-port 1g/2.5g sfp managed switch with usb console
Table of Contents

Advertisement

User's Manual of IGS-10020HPT-U

2.2.3 Wall Mount Plate Mounting

To install the I Industrial Managed PoE+ Switch on the wall, please follow the instructions below.
Follow all the DIN-rail installation steps as shown in the example.
Step 1: Remove the DIN-rail bracket from the Industrial Managed PoE+ Switch. Use the screwdriver to loosen the screws to
remove the bracket.
Step 2: Place the wall-mount plate on the rear panel of the Industrial Managed PoE+ Switch.
Step 3: Use the screwdriver to screw the wall-mount plate on the Industrial Managed PoE+ Switch.
Step 4: Use the hook holes at the corners of the wall mount plate to hang the Industrial Managed PoE+ Switch on the wall.
Step 5: To remove the wall-mount plate, reverse the steps above.
34

Advertisement

Table of Contents
loading

Table of Contents