Din-Rail Mounting - Planet IGS-10020HPT-U User Manual

Industrial 8-port 10/100/1000t 802.3at poe + 2-port 1g/2.5g sfp managed switch with usb console
Table of Contents

Advertisement

User's Manual of IGS-10020HPT-U

2.2.2 DIN-rail Mounting

This section describes how to install the Industrial Managed PoE+ Switch. There are two methods to install the Industrial
Managed PoE+ Switch -- DIN-rail mounting and wall-mount plate mounting. Please read the following topics and perform the
procedures in the order being presented.
Follow all the DIN-rail installation steps as shown in the example.
Step 1: Screw the DIN-rail bracket on the Industrial Managed PoE+ Switch.
Step 2: Lightly slide the DIN-rail bracket into the track.
Step 3: Check whether the DIN-rail bracket is tightly on the track.
Please refer to the following procedures to remove the Industrial Managed PoE+ Switch from the track.
Step 4: Lightly remove the unit from the track.
33

Advertisement

Table of Contents
loading

Table of Contents