Unpacking a Multiservice Switch 7460

Unpack the Nortel Multiservice Switch 7460 as close as possible to the
installation site.
Prerequisites
Procedure steps
Step
1
2
3
4
5
6
Copyright © 2005, Nortel
- 463 -
Hardware procedures
CAUTION
Avoid structural stress when maneuvering uncrated shelf
assemblies
When handling and moving uncrated shelf assemblies, avoid strain,
excessive shock or vibrations that can damage or warp the
equipment.
Action
Use a knife to open the packaging.
CAUTION
Risk of electrostatic damage
When handling circuit cards, wear a grounded antistatic wrist strap
or equivalent protection to avoid damaging electronic parts.
Place the control and function processor boxes (labeled with their names
and Nortel Networks part numbers) and termination panel boxes to one
side. You unpack them later.
Take each remaining unit of equipment from its box, and carefully remove its
protective packaging.
Inspect the equipment for damage. If any equipment is damaged, contact
your purchasing department and arrange to have it replaced.
Clear the unpacking area of all debris. Keep all the packing material and
containers in case the equipment has to be moved later.
Compare the contents of your shipment with the table
for unpacking a Multiservice Switch 7460 (page 464)
inventory after unpacking a Multiservice Switch 7460 (page 465)
that you have all the hardware you ordered.
If you purchased the device separately (not as part of a cabinet package),
Nortel Networks packages each unit of hardware separately.
Nortel Multiservice Switch 7400
Hardware Installation, Maintenance, and Upgrade
NN10600-175 7.1S1 Standard
PCR7.1 and up October 2005
Equipment checklist
and the figure