Installing a floor-mounted Multiservice Switch 7440
Install a floor-mounted Multiservice Switch 7440 using four feet to allow for
adequate ventilation.
Prerequisites
•
You need a vertical mount kit with PEC NTHQ08.
•
Ground yourself to an appropriate anti-static discharge apparatus while
handling the shelf assembly (device).
Procedure steps
Step
1
2
3
Procedure job aid
Securing the feet to the bottom of a floor-mounted device
Copyright © 2005, Nortel
- 193 -
Hardware procedures
Action
Tip the cabinet on its side.
Secure the feet with the 4 screws provided as shown in the figure
the feet to the bottom of a floor-mounted device (page
Move the device to the appropriate place and set it on its feet. You need 2
people to lift the device.
Nortel Multiservice Switch 7400
Hardware Installation, Maintenance, and Upgrade
NN10600-175 7.1S1 Standard
PCR7.1 and up October 2005
193).
--End--
Securing
PPT 0910 001 AA
Nortel Confidential