Chapter 2
Unpacking and Setting up the Switch
This chapter provides unpacking and setup information for the 1600 Series switch.
Specifically, it includes the following topics:
Topic
Unpacking the Switch
Installing the Switch
Powering up the Switch
Unpacking the Switch
Begin by opening the shipping carton and carefully unpacking its contents. The
carton should contain the following items:
•
•
•
•
•
If any item is missing or damaged, please contact your local Nortel reseller for
replacement.
Installing the Switch
When choosing a place to install the 1600 Series switch, use the following
guidelines:
One Ethernet Routing Switch 1600 Series Layer 3 switch
A mounting kit with two mounting brackets and six screws
Four rubber feet with adhesive backing
Two AC power cords (if ordered with appropriate country kit)
A CD containing the software and documentation for the switch
Installing the Ethernet Routing Switch1600 Series Switch
27
Page
27
27
29