Multiservice Switch 7480 installation task flow: part 2
A
Task flow navigation
•
FP addition (page 94)
•
Grounding a Multiservice Switch 7480 (page 156)
•
Installing a cooling unit into a Multiservice Switch 7480 (page 187)
•
Installing a power supply into a Multiservice Switch 7480 (page 227)
•
Installing a Multiservice Switch 7480 (page 212)
•
Installing a control processor (page 179)
•
Installing a shelf interconnect cable (page 232)
•
Installing an ac power cable (page 236)
•
Installing dc power cables onto a Multiservice Switch 7480 (page 272)
•
Installing ferrite beads onto dc power cables (page 275)
•
Installing FP cables (page 278)
•
Powering up a Multiservice Switch 7480 (page 334)
•
Unpacking a Multiservice Switch 7480 (page 466)
Copyright © 2005, Nortel
- 42 -
Multiservice Switch 7480 installation
FP
addition
Yes
Add another
FP?
Nortel Multiservice Switch 7400
Hardware Installation, Maintenance, and Upgrade
NN10600-175 7.1S1 Standard
PCR7.1 and up October 2005
Powering up a
End
Multiservice
No
Switch 7480
PP_TASK_1012