Failed FP cable replacement task flow
Switching between
active and standby
processor cards
Task flow navigation
"Clearing a switch request on Multiservice Switch 7400". See
NN10600-550 Nortel Multiservice Switch 7400/15000/20000 Common
Configuration Procedures.
Installing FP cables (page 278)
"Locking a function processor". See NN10600-550 Nortel Multiservice
Switch 7400/15000/20000 Common Configuration Procedures.
"Locking a port". See NN10600-550 Nortel Multiservice Switch 7400/
15000/20000 Common Configuration Procedures.
Removing FP cables (page 379)
Copyright © 2005, Nortel
- 83 -
Failed FP cable replacement
Failed FP cable
Yes
configuration?
Is the FP
No
configured for
APS?
Locking a function
processor
Removing FP
cables
Installing FP
cables
Unlocking a
function
processor
Switching between
active and standby
processor cards
(if necessary)
Nortel Multiservice Switch 7400
Hardware Installation, Maintenance, and Upgrade
NN10600-175 7.1S1 Standard
PCR7.1 and up October 2005
replacement
Spared
No
Yes
Locking a port
Removing FP
cables
Installing FP
cables
Unlocking a port
Clearing a switch
request on
Multiservice
Switch 7400
End
PP_TASK_1112