Installing A Multiservice Switch Cabinet Door - Nortel Multiservice Switch 7400 Installation & Maintenance

Table of Contents

Advertisement

Installing a Multiservice Switch cabinet door

Install Nortel Multiservice Switch cabinet door so that you can restrict access
to devices by locking the door.
Prerequisites
You need a cabinet door kit with PEC NTJS56.
Ensure that you have two people available to lift the door.
Follow
unit from damage by ESD or from transferring ESD to other hardware.
Procedure steps
Step
1
2
Copyright © 2005, Nortel
- 217 -
Hardware procedures
Avoiding damage from static electricity (page 135)
Action
Clear the area in front of the cabinet to access it while holding the door.
Lift the door by the grips and guide the bottom pin into the lower hinge. Then,
slide the top into place.
Nortel Multiservice Switch 7400
Hardware Installation, Maintenance, and Upgrade
NN10600-175 7.1S1 Standard
PCR7.1 and up October 2005
--End--
to protect the
Nortel Confidential

Advertisement

Table of Contents
loading

Table of Contents