Installing A Blank Processor Card - Nortel Multiservice Switch 7400 Installation & Maintenance

Table of Contents

Advertisement

Installing a blank processor card

Install a blank processor card into each empty slot on a shelf in order to meet
electromagnetic interference (EMI) regulatory requirements and thermal
specifications.
Prerequisites
You need a blank processor card with PEC NTBP23 as shown in the figure
Faceplate of a blank processor card (page
Follow
card from damage by ESD.
Procedure steps
Step
1
2
3
4
Copyright © 2005, Nortel
- 168 -
Hardware procedures
Avoiding damage from static electricity (page 135)
Action
Unpack the blank processor card. Keep the packaging materials for future
use.
Pull open the top and bottom latches of the blank processor card and slide
it into the slot until the locking latches begin to close.
Ensure the latch lock is fully disengaged by turning it counterclockwise by a
1/4 turn.
Close and lock the latches. See the figure
card latches (page
249).
Nortel Multiservice Switch 7400
Hardware Installation, Maintenance, and Upgrade
NN10600-175 7.1S1 Standard
PCR7.1 and up October 2005
169).
Locking and unlocking processor
--End--
to protect the
Nortel Confidential

Advertisement

Table of Contents
loading

Table of Contents