FP decommissioning
Decommission a function processor (FP) if you want to install a different type
of FP in its slot, or if the slot is no longer being used.
Prerequisites to FP decommissioning
•
Some of the procedures in this task are not located in this document.
Ensure that you have access to the required documents.
FP decommissioning task flow
This task flow shows you the sequence of procedures you do to
decommission one or more FPs. To link to any procedure, go to
navigation (page
Copyright © 2005, Nortel
100).
Nortel Multiservice Switch 7400
Hardware Installation, Maintenance, and Upgrade
NN10600-175 7.1S1 Standard
PCR7.1 and up October 2005
Task flow
Nortel Confidential