Multiservice Switch 7460 installation task flow: part 2
A
Task flow navigation
•
FP addition (page 94)
•
Grounding a dc-powered Multiservice Switch 7460 (page 154)
•
Installing a control processor (page 179)
•
Installing a cable management bracket on a Multiservice Switch 7460
(page 176)
•
Installing a cooling unit into a Multiservice Switch 7460 (page 182)
•
Installing a power supply in a Multiservice Switch 7460 (page 220)
•
Installing a Multiservice Switch 7460 shelf assembly (page 206)
•
Installing a rack-mounted alarm panel / power and alarm panel (page 230)
•
Installing dc power cables onto a Multiservice Switch 7460 (page 268)
•
Installing ferrite beads onto dc power cables (page 275)
•
Installing FP cables (page 278)
•
Powering up a Multiservice Switch 7460 (page 331)
•
Removing the cooling unit from a Multiservice Switch 7460 (page 394)
•
Unpacking a Multiservice Switch 7460 (page 463)
Copyright © 2005, Nortel
- 32 -
Multiservice Switch 7460 installation
FP
addition
Yes
Add another
No
FP?
Nortel Multiservice Switch 7400
Hardware Installation, Maintenance, and Upgrade
NN10600-175 7.1S1 Standard
PCR7.1 and up October 2005
Powering up a
End
Multiservice
Switch 7460
PP_TASK_1110
Nortel Confidential