Site Preparation; Site Preparation Checklist For The Junos Pulse Gateway; Table 18: Site Preparation Checklist For The Junos Pulse Gateway Installation - Juniper Junos Pulse MAG2600 Hardware Manual

Hide thumbs Also See for Junos Pulse MAG2600:
Table of Contents

Advertisement

CHAPTER 4

Site Preparation

Site Preparation Checklist for the Junos Pulse Gateway

Copyright © 2014, Juniper Networks, Inc.
Site Preparation Checklist for the Junos Pulse Gateway on page 27
General Site Guidelines for Installing the Junos Pulse Gateway on page 28
Junos Pulse Gateway Electrical and Power Requirements on page 29
The checklist in
Table 18 on page 27
a site for installing the Junos Pulse Gateway.
Table 18: Site Preparation Checklist for the Junos Pulse Gateway
Installation
Item or Task
Environment
Verify that environmental
factors such as temperature
and humidity do not exceed
device tolerances.
Power
Measure the distance
between the external power
sources and device
installation site.
Locate sites for connection
of the system grounding.
Rack and Cabinet Installation
Verify that your rack meets
the minimum requirements.
Plan rack location, including
required space clearances.
Secure the rack to the floor
and building structure.
Desktop Installation
summarizes the tasks you need to perform to prepare
Additional Information
Junos Pulse Gateway
Environmental Specifications
"Junos Pulse Gateway
Electrical and Power
Requirements" on page 29
"Junos Pulse Gateway Rack
Requirements" on page 31
"Junos Pulse Gateway Cabinet
Requirements" on page 32
Date and Notes
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents