Calibration Procedure

Procedure
Calibration
Calibration
Procedure
NOTICE
NOTICE
NOTICE
To prevent damage to the heated hose, a hose
calibration is required if any of the following
conditions are true:
• The hose has never been calibrated before.
• A section of hose has been replaced.
• A section of hose has been added.
• A section of hose has been removed.
NOTE: The Reactor and heated hose must be at
NOTE:
NOTE:
the same ambient temperature to get the most
accurate calibration.
1. Enter Setup Mode and navigate to System
screen 3, then press the Calibrate soft key
.
2. Press the Continue soft key
acknowledge the reminder to have the hose
at ambient conditions.
68
3. Wait while the system measures the hose
resistance.
NOTE: If hose heat was on prior to the
NOTE:
NOTE:
calibration procedure, the system will
wait up to five minutes to allow the wire
temperature to equalize.
NOTE: The hose temperature must be above
NOTE:
NOTE:
32 °F (0 °C) during calibration.