Shutdown

Shutdown
Shutdown
Shutdown
NOTICE
NOTICE
NOTICE
Proper system setup, startup, and shutdown
procedures are critical to electrical equipment
reliability. The following procedures ensure
steady voltage. Failure to follow these
procedures will cause voltage fluctuations that
can damage electrical equipment and void the
warranty.
1. Press
to stop the pumps.
2. Turn off all heat zones.
3. Relieve pressure.
Pressure Relief Procedure, page
4. Press
to park the Component A and
Component B pumps. The park operation
is complete when green dot goes out.
Verify the park operation is complete before
moving to next step.
5. Press
to deactivate the system.
50
See
49.
6. Turn off the air compressor, air dryer, and
breathing air.
7. Turn the main power switch OFF.
To prevent electric shock do not remove any
covers or open the electrical enclosure door
while the power is ON.
8. Close all fluid supply valves.
9. Set PRESSURE RELIEF/SPRAY valves to SPRAY
to seal out moisture from the drain line.
10. Engage gun piston safety lock then close
fluid inlet valves A and B.