Nortel Meridian ITG Line 2.0 Description, Installation And Operation Manual page 182

Internet telephony gateway line
Table of Contents

Advertisement

Page 182 of 302
Figure 27
Scheduling window
553-3001-204 Preliminary 0.10 August 2000
ITG line card 2.0 administration
Procedure 30
Report scheduling
1
In the ITG Main window, click File | Report | Generate.
2
In the ITG - Generate Report window, select the Schedule report
generation radio button.
3
Click OK. The Scheduling window appears (see Figure 27).
4
In the "Job" text box, enter the name and description of the schedule.
5
In the "Run" box, click the radio button that indicates the frequency of
report generation
6
In the "Start at" box, enter the month, day, year, hour, and minute of
the start of the report period. Select the "am" or "pm" radio button.
7
Click Apply and OK
—————————— End of Procedure ——————————.

Advertisement

Table of Contents
loading

Table of Contents