Alcatel-Lucent 1665 Installation Manual page 346

Hide thumbs Also See for 1665:
Table of Contents

Advertisement

Installation checklist
Section and Chapter
Chapter 5, "Operational
tests"
............................................................................................................................................................................................................................................................
E - 6
Procedure
Delete the existing DS3 cross-connections (p.
4-32)
LNW66, LNW71 and LNW74 (10/100T) TX
Ethernet cabling testing (p. 4-36)
Ethernet port assignment verification testing (p.
4-36)
Ethernet port wiring verification testing (p.
4-37)
OC-3 (LNW37, LNW45, LNW55)/OC-12
(LNW49, LNW55)/OC-48 (LNW55, LNW62)
low-speed SFP test procedure (p. 4-41)
OC-3/OC-12/OC-48 SFP low-speed SFP test
procedure (p. 4-41)
OC-3 (low-speed) testing (p. 4-43)
OC-3 testing procedure (p. 4-43)
OC-12 (low-speed) testing (p. 4-47)
OC-12 testing procedure (p. 4-47)
OC-12 facility loopback testing (p. 4-49)
OC-48 (low-speed) testing (p. 4-52)
OC-48 low-speed testing procedure (p. 4-52)
OC-48 facility loopback testing (p. 4-53)
LED test (p. 4-56)
LED test procedure (p. 4-56)
Additional optical tests (optional) (p. 4-57)
Low -speed optical testing (p. 4-57)
Office alarm test (p. 5-4)
Office alarm test procedure (p. 5-5)
Automatic protection switching and alarm test
(p. 5-8)
Main OLIU switching test (p. 5-8)
Overview
Completed
Required
Yes
No
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
365-372-304R7.1
Issue 1, November 2007