Powering and initial circuit pack installation for 1665 Data
Multiplexer (1665 DMX)
put the circuit breaker, associated with the "A" feed of the 1665 DMX, in the OFF
position.
........................................................................................................................................................................................................................
Verify the PWR B LED on the 1665 DMX High-Capacity shelf is lighted with only the
14
"B" feed powered.
........................................................................................................................................................................................................................
At the BDFB either insert the fuse or put the circuit breaker, associated with the "A" feed
15
of the 1665 DMX High-Capacity shelf in the ON position.
........................................................................................................................................................................................................................
Verify that the both the PWR A LED and PWR B LED on the 1665 DMX High-Capacity
16
shelf user panel are lighted with both the "A" and "B" feeds powered.
........................................................................................................................................................................................................................
Verify that the fans are still running and are moving air.
17
........................................................................................................................................................................................................................
Check off the appropriate box in
18
E
O
N D
........................................................................................................................................................
............................................................................................................................................................................................................................................................
2 - 6
S
F
T E P S
Appendix E, "Installation
checklist".
365-372-304R7.1
Issue 1, November 2007
Powering