Omron CJ Series Operation Manual page 34

Machine automation controller
Hide thumbs Also See for CJ Series:
Table of Contents

Advertisement

Precautions for Correct Use
Battery Replacement
• Be sure to install a replacement Battery within two years of the production date shown on the Battery
label.
• Turn ON the power after replacing the Battery for a CPU Unit that has been unused for a long time.
Leaving the CPU Unit unused again without turning ON the power even once after the Battery is
replaced may result in a shorter Battery life.
• When you replace the Battery, use the CJ1W-BAT01 Battery Set.
SD Memory Cards
• Insert the SD Memory Card all the way.
• Do not turn OFF the power supply to the Controller during SD Memory Card access. The files may be
corrupted.
If there is a corrupted file in the SD Memory Card, the file is automatically deleted by the restoration
function when the power supply is turned ON.
32
CJ-series CompoNet Master Unit Operation Manual for NJ-series CPU Unit (Cat. No. W493)

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Nj seriesCj1w-crm21

Table of Contents