3
Pressure-welding the connector
The connector is pressure-welded using the DWT-A02 Pliers.
(1) Align the center (see arrows) of the connector cover with the center of the pressure-
welding block on the DWT-A02 Pliers.
Special tool (DWT-A02 Pliers)
(2) Squeeze firmly on the Pliers until the lock on the connector clicks into place.
(3) After attaching the cable, confirm that it is properly pressure-welded.
Be sure there are no gaps here.
CJ-series CompoNet Master Unit Operation Manual for NJ-series CPU Unit (Cat. No. W493)
Connector position reference surfaces
Connector cover
Be sure that the connector is locked.
4 Installation and Wiring
4
4-29