Omron CJ Series Operation Manual page 144

Machine automation controller
Hide thumbs Also See for CJ Series:
Table of Contents

Advertisement

4 Installation and Wiring
Round Cable II, Flat Cable I, or Flat Cable II
The communications power to Slave Units is supplied through a Round Cable II, Flat Cable I or Flat
Cable II cable. Therefore there is no need to provide a communications power supply for Slave Units
separately. The communications power supply can be shared by all Slave Units within the same trunk
line or sub-trunk line. The I/O power must be supplied separately to the Slave Units which need I/O
power, i.e., Slave Units with a multi-power supply.
Without Repeater Units
Master Unit
BS+
BS-
BS+
BDH
BDL
BS-
4-36
Communications
power supply
Overcurrent
connector
protection (*1)
(current limit: 4 A)
Trunk line
Branch
lines
Slave Unit
Slave Unit
CJ-series CompoNet Master Unit Operation Manual for NJ-series CPU Unit (Cat. No. W493)
Communications
power supply
*1: When complying with UL standards, install a
device to limit the current between the
V
external power supply and the Unit to 4 A or
less for the communications power supply.
Power
supply
G
Round Cable II, Flat Cable I, or Flat Cable
II
Slave Unit
Terminating
Resistor
Slave Units
with network
Slave Unit
power supply

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Nj seriesCj1w-crm21

Table of Contents