Omron CJ Series Operation Manual page 130

Machine automation controller
Hide thumbs Also See for CJ Series:
Table of Contents

Advertisement

4 Installation and Wiring
5
Pressure-welding the Connector
Use the DWT-A01 Pliers to pressure-weld the connector.
(1) Align the center (see arrows) of the connector cover with the center of the pressure-
welding block on the DWT-A01 Pliers.
Special tool (DWT-A01 Pliers)
(2) Squeeze firmly on the Pliers until the lock on the connector clicks into place.
Precautions for Correct Use
Precautions for Correct Use
• Do not pressure-weld the connector cover at the edges.
• Do not pressure-weld the connector cover at the back of the pressure-welding block.
• Set the connector in the correct orientation.
(3) After attaching the cable, confirm that it is properly pressure-welded.
4-22
OK
NG
Be sure the connector is locked
on both the left and right sides.
Be sure there are no gaps here.
CJ-series CompoNet Master Unit Operation Manual for NJ-series CPU Unit (Cat. No. W493)
Connector cover
NG

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Nj seriesCj1w-crm21

Table of Contents